Silicon Carbide for AI Data Center Power and GPU Thermal Management
碳化矽在 AI 資料中心供電與 GPU 熱管理的應用
Bilingual engineering research report • 13 November 2026
英中雙語工程研究報告 • 2026 年 11 月 13 日
Executive Summary
執行摘要
SiC can reduce electrical conversion losses in the high-voltage power chain. Using SiC as a GPU packaging material can also improve heat transfer when the material connects a significant heat path to a sink. These mechanisms require separate measurements before their energy benefits can be combined. [1–5]
SiC 可降低高壓供電鏈的電力轉換損耗。SiC 作為 GPU 封裝材料時,若位於通往散熱端的重要熱流路徑,也可改善熱傳。兩種機制應分別量測,再合併估算節能。[1–5]
In the modeled 100 MW AIDC, increasing conversion-stage efficiency from 97.0% to 98.5% yields 13.20 GWh of annual site savings at 80% average load, including modeled cooling savings. At NT$3.50/kWh and NT$120 million incremental investment, simple payback is 2.7 years after NT$2 million/year of incremental operating costs.
在 100 MW AIDC 模型中,轉換級效率由 97.0% 提升至 98.5%,平均負載率為 80%,含冷卻節電的全站年節電量為 13.20 GWh。以電價 NT$3.50/度、增量投資 NT$1.20 億及增量維運費 NT$200 萬/年估算,簡單回收期為 2.7 年。
A 1,000 W GPU would run 2–5°C cooler at the hotspot if the effective hotspot-to-coolant resistance decreased by 0.002–0.005 K/W. This is a thermal design target derived from an assumed resistance change. The substrate position and actual package stack determine whether that target is achievable.
若熱點至冷卻液的有效熱阻降低 0.002–0.005 K/W,1,000 W GPU 的熱點可降低 2–5°C。此數值是依假設熱阻變化推得的設計目標,能否達成取決於載板位置與實際封裝堆疊。
1 Technology and Evidence
1 技術與證據
High Voltage Power Conversion
高壓電力轉換
SiC switches can reduce conduction and switching losses in suitable high-voltage stages. Topology, switching frequency, magnetics, cooling and load sharing determine actual converter efficiency. NVIDIA proposes 800 VDC distribution for megawatt-class IT racks. Higher bus voltage reduces current at equal delivered power. Conductor savings depend on effective resistance and layout. [1–3]
在合適的高壓轉換級,SiC 開關可減少導通與開關損耗。實際效率受拓撲、開關頻率、磁性元件、冷卻及負載分攤影響。NVIDIA 提出以 800 VDC 支援 MW 級 IT 機櫃。同功率下提高母線電壓可降低電流,導體減損取決於有效線阻與配置。[1–3]
Infineon reports over 97% efficiency and 113 W/in³ for its 12 kW PSU reference design using Si, SiC and GaN. These are design-level figures. Isolating SiC’s contribution requires a comparison under matched conditions. [3]
Infineon 的 12 kW PSU 參考設計整合 Si、SiC 與 GaN,公布效率超過 97%,功率密度為 113 W/in³。這些是整機設計數據,SiC 的個別貢獻需在相同條件下對照量測。[3]
300 mm SiC Manufacturing
300 mm SiC 製造
On 9 November 2026, Infineon announced functional power devices fabricated on 300 mm SiC wafers at Villach using existing silicon manufacturing equipment. It estimated about 2.3 times as many die sites per wafer as on 200 mm wafers and reported 300 mm Cold Split feasibility at Dresden. Production yield, ramp timing, qualified die cost and GPU package performance remain to be established. [1]
Infineon 於 2026 年 11 月 9 日宣布,在 Villach 使用既有矽製造設備,於 300 mm SiC 晶圓上製成功能性功率元件。公司估計每片晶圓可容納約為 200 mm 的 2.3 倍晶粒,並公布 Dresden 的 300 mm Cold Split 可行性成果。量產良率、量產時程、合格晶粒成本及 GPU 封裝效能仍待確認。[1]
2 Site Energy Model
2 全站能耗模型
The model holds IT power at the output of the modified stage and assigns conversion losses to facility overhead. Baseline full-load PUE is 1.250. The modeled cooling response is 0.20 kW of electricity saved per kW of heat avoided. Savings depend on where the converter rejects heat and whether cooling controls respond. Use the same IT metering boundary for any PUE comparison.
模型以改良轉換級輸出作為固定 IT 功率,轉換損耗歸入設施用電。基準滿載 PUE 為 1.250。每減少 1 kW 廢熱,假設冷卻少用 0.20 kW 電力。冷卻節電取決於模組排熱位置及控制系統反應。比較 PUE 時須使用相同 IT 電表邊界。
Power saved = stage output × (1 / baseline efficiency − 1 / improved efficiency). Annual energy saved equals the sum of power saved at each operating point multiplied by its operating hours.
供電節省功率=轉換級輸出 ×(1/基準效率 − 1/改良效率)。全年節電量為各工況的節省功率乘以對應時數後加總。
| Metric 指標 |
Baseline 基準 |
Improved 改良 |
| Stage efficiency 轉換級效率 |
97.0% | 98.5% |
| Loss at 1 MW output 1 MW 輸出轉換損耗 |
30.93 kW | 15.23 kW |
| Loss at 100 MW output 100 MW 輸出轉換損耗 |
3.093 MW | 1.523 MW |
| Full load site power 滿載全站功率 |
125.000 MW | 123.116 MW |
| PUE under model boundary 模型邊界下的 PUE |
1.250 | 1.231 |
At full load, the 100 MW case saves 1.570 MW at the power stage and 0.314 MW in cooling. At 8,760 full-load hours, the combined savings are 16.50 GWh/year. At 25 MW or 50 MW coverage, the same full-load assumptions yield 4.13 or 8.25 GWh/year. With 100 MW coverage and zero cooling response, full-load savings are 13.75 GWh/year.
100 MW 滿載時,供電級少耗 1.570 MW,冷卻少耗 0.314 MW。全年滿載 8,760 小時合計節電 16.50 GWh。若改良級只覆蓋 25 MW 或 50 MW,相同滿載假設下年節電分別為 4.13 或 8.25 GWh。覆蓋 100 MW 且冷卻用電無變化時,滿載年節電為 13.75 GWh。
3 Investment and Payback
3 投資與回收
The investment model assumes 7,008 equivalent full-load hours per year, a flat NT$3.50/kWh, NT$120 million of incremental capital expenditure and NT$2 million/year of incremental operating costs. Incremental capital includes equipment, installation, integration and validation. Simple payback equals capital divided by annual net savings. Demand charges, financing and taxes are excluded.
投資模型採每年 7,008 等效滿載小時、固定電價 NT$3.50/度、增量資本支出 NT$1.20 億及增量維運費 NT$200 萬/年。增量投資包含設備、安裝、整合與驗證。簡單回收期為增量投資除以年淨節省。模型排除需量費、融資與稅負。
| Efficiency 效率 |
GWh/year 年節電 |
Net NT$m/year 年淨省百萬元 |
Payback years 回收年數 |
3 year cap NT$m 三年投資上限百萬元 |
| 97.5% | 4.45 | 13.56 | 8.9 | 40.69 |
| 98.0% | 8.85 | 28.96 | 4.1 | 86.89 |
| 98.5% | 13.20 | 44.21 | 2.7 | 132.62 |
In the 98.5% case, the annual savings consist of 11.00 GWh from power conversion and 2.20 GWh from cooling. If only conversion savings are counted, simple payback is 3.3 years and the three-year investment cap is about NT$110 million. With only 50 MW covered, the modeled annual savings are 6.60 GWh before applying the actual phase-one costs.
在 98.5% 情境,供電轉換年節電 11.00 GWh,冷卻年節電 2.20 GWh。若只採計供電節電,簡單回收期約 3.3 年,三年回收可接受的增量投資約 NT$1.10 億。若首期只覆蓋 50 MW,模型年節電約 6.60 GWh,應搭配首期實際投資及維運費重算。
A three-year target requires NT$42 million/year in gross electricity savings, equivalent to 12.00 GWh/year. The minimum modeled converter efficiency is 98.36% with the assumed cooling response or 98.64% with conversion savings alone. Procurement analysis should replace flat assumptions with measured efficiency curves, hourly loads and applicable tariffs.
三年回收要求每年電費毛節省 NT$4,200 萬,相當於 12.00 GWh。含假設冷卻節電時,模型要求轉換級效率至少達 98.36%,僅計供電節電時則為 98.64%。採購評估應以實測效率曲線、逐時負載及適用電價更新試算。
4 GPU Packaging and Cooling
4 GPU 封裝與散熱
Published bulk conductivity values are about 380–450 W/m·K for SiC and 150 W/m·K for silicon. For equal area and thickness, R = t/(kA), so the material-layer resistance drops by about 61–67%. Interface layers, actual material grade, heat spreading and coolant-side resistance determine the package result. [4–5]
公開資料列出 SiC 體材料熱導率約 380–450 W/m·K,矽約 150 W/m·K。以相同厚度與面積代入 R=t/(kA),材料層自身熱阻約降低 61–67%。封裝結果由介面層、實際材料等級、熱擴散及冷卻液側熱阻共同決定。[4–5]
| Placement 位置 |
Thermal mechanism and check 熱傳機制與驗證 |
| ABF package substrate ABF 有機封裝載板 |
Benefit depends on the heat carried toward the substrate side and its connection to a sink. Verify electrical routing and package reliability. 效益取決於載板側熱流及其與散熱端的連接,並須驗證布線與封裝可靠度。 |
| Silicon interposer replacement 取代矽中介層 |
Changes lateral spreading and GPU–HBM coupling. Measure both hotspots. 改變橫向擴熱及 GPU 與 HBM 的熱耦合,應同步量測兩者熱點。 |
| Backside heat spreader 晶片背面熱擴散層 |
Changes the main path to a top cold plate. Include bond and thermal interface resistance. 改變通往上方冷板的主熱路,須計入接合層及熱介面熱阻。 |
At 1,000 W and fixed coolant inlet temperature and flow, effective resistance reductions of 0.001, 0.002, 0.005 and 0.010 K/W correspond to 1, 2, 5 and 10°C hotspot reductions. These are parametric results. A 5°C target requires a measured reduction of 0.005 K/W.
在 1,000 W 且冷卻液入口溫度與流量固定時,有效熱阻分別降低 0.001、0.002、0.005、0.010 K/W,對應熱點降溫 1、2、5、10°C。以上為參數試算。若目標降 5°C,需實測有效熱阻降低 0.005 K/W。
At fixed GPU power, thermal headroom can support warmer coolant or lower flow. If the affected cooling zone averages 5 MW and optimization cuts its electric consumption by 5%, the average site reduction is 0.25 MW, or 2.19 GWh/year. Count only independently measured savings when combining packaging and power-conversion changes.
GPU 功耗固定時,新增溫度餘裕可用於提高供液溫度或降低流量。若受影響冷卻區平均耗電 5 MW,調整後實測節電 5%,全站平均可少用 0.25 MW,相當於每年 2.19 GWh。合併封裝與電源方案時,須確認各項節電可獨立歸因。
5 Validation and Sources
5 驗證與資料來源
Measure AC input, DC bus and IT delivery at 25%, 50%, 75% and 100% load, including redundancy and GPU load steps. Compare at matched workload, throughput, firmware and power limits. Record stage losses, auxiliary loads and metering uncertainty.
在 25%、50%、75%、100% 負載量測 AC 入口、DC 母線及 IT 交付功率,並納入冗餘運轉與 GPU 負載階躍。維持相同工作負載、吞吐量、韌體及功率上限,記錄逐級損耗、輔助用電與量測不確定度。
Measure GPU and HBM hotspots at matched power, coolant inlet temperature and flow. Estimate liquid heat rejection as mass flow × specific heat × temperature rise. Meter air-side cooling, CDU, pumps and heat rejection separately. Compare energy per completed workload and apply hourly operating data to the investment model.
在相同功耗、冷卻液入口溫度與流量下量測 GPU、HBM 熱點。液冷排熱以質量流率 × 比熱 × 進出口溫差估算。分別量測空冷、CDU、泵浦與排熱設備用電,比較相同工作量的用電,並以逐時運轉資料更新投資模型。
[1] Infineon. 300 mm power silicon carbide wafer announcement, 9 Nov 2026.
英飛凌 300 mm 功率碳化矽晶圓公告,亦為使用者提供附件的公開版本。 Source / 原文
[2] NVIDIA. 800 VDC Architecture Will Power the Next Generation of AI Factories, 20 May 2025.
NVIDIA 800 VDC AI 工廠供電架構。 Source / 原文
[3] Infineon. 12 kW high frequency and high power density PSU for AI data centers and server applications.
英飛凌 12 kW AI 伺服器電源參考設計應用說明。 Source / 原文
[4] IEEE Electronics Packaging Society. January 2026 issue, Table I on packaging material properties.
IEEE 電子封裝學會 2026 年 1 月刊,表一封裝材料特性。 Source / 原文
[5] National Center for Instrumentation Research. Section 2.1 on SiC in GPU and HBM integration.
國家儀器科技研究中心,第 2.1 節 SiC 在 GPU 與 HBM 整合中的優勢。 Source / 原文